DESCRIPTION
This is the water system responsible for water collection (via rainwater harvesting) and distribution to shed 3. This projects duration was approximately 4 months. The apparatus consists of eavestroughs to collect water on either side of the angled roof, PEX pipes to guide the water down to the water tank, a water tank with a 4 layer filtration system and a automated pump that distributes water to the sink on the inside of the small home.
GNG1103- Water group shed 3
PROJECT BY
PUBLISHED ON
Apr 18 2018
PROJECT FILES | Download |
CATEGORIES
GNG1103/GNG1503
LICENSE
Creative Commons - Attribution
Linked to Project Proposal:
None
Comments
Top votes
Newest