Please ensure Javascript is enabled for purposes of website accessibility
Repository Main image
Repository Image Repository Image Repository Image Repository Image


DESCRIPTION

This is the water system responsible for water collection (via rainwater harvesting) and distribution to shed 3. This projects duration was approximately 4 months. The apparatus consists of eavestroughs to collect water on either side of the angled roof, PEX pipes to guide the water down to the water tank, a water tank with a 4 layer filtration system and a automated pump that distributes water to the sink on the inside of the small home.

GNG1103- Water group shed 3
0 0
PROJECT BY
PUBLISHED ON
Apr 18 2018
CATEGORIES
GNG1103/GNG1503
Make
Linked to Project Proposal:
None
Comments